STATUS OF INFRASTRUCTURE IN JNV’S-

 

 

I

Area of land  allotted (in acres)

 

Whether land transferred in the Name of Samiti

 

Vidyalaya shifted to permanent buildings on

 

 

:32.08

 

:YES

 

 

:YES

 

ii

Status of Boundary Wall

 

a.  Brick Wall

b.  Barbed wire fencing

 

 

: (Completed / Incomplete) COMPLETED

 

BRICK WALL

 

iii

Permanent buildings constructed

 

 

: (CBRI pattern/ CPWD pattern)

BOTH

 

iv

School building

 

 

 

: Complete / Incomplete

COMPLETED

 

v

Dormitories

:  Boys __05__ Nos.

   with Warden Residence__06__ Nos.

 

 

 

 

:  Girls ___03___ Nos.

   with Warden Residence__02__ Nos.

 

 

vi

Kitchen/dining Hall

 

No. of shifts required for all students  to take food

 

 

:  Complete / not complete, Area ______

COMPLETED

SINGLE (TWO DINING HALLS AVAILABLE)

 

 

vii

Principal Residence

 

 

:  _01_ YES.

 

viii

Staff Quarters

 

 

 

 

: Type III = __16__ Nos.

  Type II = __12__ Nos.

  Type  I  = _NA_ Nos.

  SP Sheds converted into Staff Qrs.:__10__ Nos.

 

ix

M.P. Hall

 

: Available / not available

AVAILABLE

x

Workshop

 

: Available / not available

AVAILABLE

xi

Type of O.H. Tank

 

Its capacity

 

Present Status

 

: Shaft type / Column based

COLUMN BASED

:  _135000_ litres

 

: Working satisfactory / not satisfactory

WORKING SATISFACTORY

xii

U.G. tank

 

Its capacity

 

Present Status

 

 

:  _1,00,000_ litres

 

: Working satisfactory / not satisfactory

NOT SATISFACTORY

xiii

D.G. Set

 

 

 

 

:  Available / not available

AVAILABLE

: __KIRLOSKAR__ make

:   __40__ KV

: Working / not working

WORKING

: Year of procurement

1992

 

xiv

Sewage Pump

 

: ___NIL___ H.P.

xv

Water Pump

 

 

: ___NIL___ capacity

xvi

Electrification

 

Electric connection

Sub Station building

Street lighting

 

Numbers of hrs. during day when power supply is available on an average.

 

 

 

 :  Rural / Urban Feeder- RURAL FEEDER

:  Complete/ Incomplete COMPLETE

: __42__ Nos. of Poles

 

: ___18___ hrs.

  

xvii

Playfields

 

400 metre track

40 x 30 metre basket ball court

40 x 30 metre volley ball court

 

 

 

: Available/ not available

:  __02_____Nos.   – Available / not available

:  __02_____Nos.   – Available / not available

 

xviii

Water supply

Tube Well

Hand pump

Connection from PHED

 

 

 

: Potable,  _NA_ Nos.-  working / not working

: Potable, __NA__ Nos.-  working / not working

:  __NA__ hours supply in a day

xix

Rajiv Gandhi Smriti Van

 

:  Available / not available

AVAILABLE

xx

Fire fighting arrangement

 

:  Working / not working

WORKING

xxi

Last date of cleaning of

  1. Septic tank
  2. Water tanks

 

: JUNE 2015

: JUNE 2015

xxii

Whether area around transformer is fenced

:  Yes  /  No

YES

xxiii

Whether open wells, if any, are covered from top

:   Yes / No

NA

xxiv

Works taken up under M&R fund during current year and last year:-

 

:NA

Year

Name of work  (M&R)

Expenditure

(Rs. In lacs)

Cumulative expenditure during the year

2014-15

DAY TO DAY MENTENANCE, WHITE WASH, COLOURWASH, PAINTING, FIXING OF GLASS PANS.

4.5

4.50

           

 

 

Details of vehicle provided to the Vidyalaya

 

(i)

Whether vehicle is provided or not (Yes/No)

 

YES

(ii)

Description to vehicle.

 

No. –UP-09/929

(iii)

Model no and date of purchase.

 

MM540DP4WDPRP JUNE 2000

(iv)

Present condition of the Vehicle.

 

 

VAN IS RUNNING BUT EXPENDITURE BEING INCURRED MORESIDE.

 

Untitled Document